A California balancing authority is to blame for the Procedure with the transmission grid inside of its metered boundaries which isn't limited with the political boundaries with the point out of California. (e) “Procurement entity” indicates anyone or corporation authorized from the commission to enter into contracts to obtain suitable renewab